Wales has 245,310 social homes, of which 47% do not yet meet WHQS 2023 standards. This creates a massive retrofit pipeline over the next decade, generating enormous volumes of construction waste that must be tracked, diverted, and reported under increasingly stringent ESG requirements. Combined with new-build developments, the opportunity for circular construction is significant.
245,310
Social homes in Wales
47%
Below WHQS 2023
0.85t
CO₂e avoided / property
40%
Skip reduction target
Our Solution
TroCymru intercepts construction waste on-site, tracks every material with QR codes, and delivers WLCA-aligned carbon savings and social value metrics. We cover most external and internal schemes linked to WHQS Retrofit Programmes — kitchens, bathrooms, roofing, windows, doors, external wall insulation, and electrical upgrades — as well as new-build developments where up to 80% of waste is hard plastics (drainage pipes, uPVC fascia offcuts). We provide audit-ready ESG data — not just waste disposal.
Fly-Tipping Prevention for Local Authorities
Two local authorities have requested TroCymru's QR chain-of-custody system to prevent fly-tipping. Every waste load leaving a property is QR-tagged, photographed, GPS-stamped, and tracked to its licensed waste station. This creates an unbroken digital evidence trail that makes prosecution straightforward — and, more importantly, deters fly-tipping before it happens.
Three Service Layers
A structured system that transforms construction waste into measurable operational, financial, and environmental outcomes.
Operational Layer
We do the work
On-site material interception, segregation, and recovery — with full traceability built in. Designed to reduce waste at source and improve control across site operations. Providing immediate operational and cost efficiencies on site.
Commercial model tailored following site assessment
Data Layer
We create value from it
A programme-level data layer that converts site activity into compliance-ready ESG, carbon, and social value data. Full material traceability supporting compliance and duty of care obligations.
Commercial model tailored following site assessment
Strategic Layer
We scale it across programmes
Embed TroCymru across programmes to deliver measurable financial, environmental, and social outcomes at scale. Connecting site operations with organisational strategy and reporting requirements.
Commercial model tailored following site assessment
Why TroCymru?
Audit-ready ESG data eliminates reporting burden
WLCA-aligned carbon metrics for Net Zero claims
Evidenced social value through community reuse
NRW registered (CBDU033191)
Live pilots with Welsh housing associations
Williams Homes: all live & upcoming sites committed
New-build waste: 80% hard plastics recovery potential
Covers most external & internal WHQS retrofit schemes
Fly-tipping prevention via QR chain-of-custody tracking
Local authority enforcement support
What Every Programme Delivers
Up to 40% skip volume reduction — fewer skips, lower disposal costs
0.85 tCO₂e avoided per property — WRAP/ICE-calculated, auditable
Measurable social value — materials routed to social enterprises
Chain-of-custody evidence — fly-tipping eliminated at source
Compliance-ready data — ESG, SRS, and funding narratives
Request an Initial Site Assessment
We'll scope your programme, tailor the commercial model, and show you projected savings, carbon impact, and social value — before you commit.